Projects

image copy

Powis View Barry

Powis View Regeneration

Timescale

October 2022 - August 2023

Description of work:

We were appointed principal contactor to carry out the external refurbishment to 11 Blocks of flats in Powis View Barry. The following works were carried as part of the contract.

  • Roof renewals to all Blocks of flats
  • Roof line works to all blocks
  • Licenced asbestos removal to 9 blocks
  • 300mm loft insulation to al all blocks
  • Circa 450 windows replaced
  • Insulation and rendering to window panels on all blocks
  • Decoration to all blocks

Gwyn Court - Port Talbot

Sheltered Housing Refurbishment

Timescale

March - Dec 2017

Awards

Federation of Master Builders 2019 Public Sector / Local Authority Winner 2019
Elderly Accommodation Counsel (EAC) Awards 2019

Description of work:

Live building refurbishment of 18 flats consisting of:

  • Conversion of 8 bed sits into one bed flats
  • Refurbishment of 8 one bed flats
  • Creation of one additional flat to existing quantity
  • Refurbishment of large 2 bed (former warden) flat
  • Installation of new incoming 3-phase power supply
  • Installation of platform lift
  • RNIB Compliant colour schemes throughout
  • Upgrading of fire safety
Processed with VSCO with  preset

Mozart Court

Mozart Court - Port Talbot

Sheltered Housing Refurbishment

Timescale

2015 - 2017

Awards

NPTC Building Control Awards 2017- Best Change of Use or Conversion Winner.

LABC South Wales Region 2017 – Best Change of Use or Conversion nomination.

Description of work:

Live building refurbishment of 44 flats to include;

  • Flat roof conversion to pitched
  • New incoming 3-phase power supply
  • Conversion of bed sit flats into 1 bed flats
  • Upgrading of building fabric to improve fire resistance – FD30 Doors, Timonox Paint, Fire rated ceiling renewals etc.
  • Upgrading of warden call system & IT infrastructure

The final stage of the refurbishment was in the communal lounge, following which the residents celebrated with a re-opening party with invite to all workmen involved in the refurbishment.

The following comments were made;

NPT Homes Accommodation Assistant Tania Herne said:

The refurbishment of the communal area at Mozart Court has created a modern, inviting place for residents to meet, socialise and interact with each other. It was important that the area would be inclusive to everyone and that’s why we ensured that the work adhered to the RNIB’s Visibly Better standard.

One of the residents at Mozart Court, June Brayley said:

The new lounge is wonderful.  It has really created a space where we enjoy spending time and has really enhanced the community feel here.  I’m really looking forward to spending time in here with my fellow residents.

Property Building Maintenance (Wales) Ltd.

Committed to Providing the Best Building Maintenance, Refurbishment and New Build Services to our Clients.

Accreditations

dc_badge1
dc_badge1_cy
GAS-SAFE-LOGO-ORIGI-JPEG
CHAS-500x333
Constructionline_Logo
Layout 1
ISO 9001; ISO 14001 - CMYK-1
image-ac_001-2
SMAS_Worksafe_Logo
oftec-logo-rgb
FMB
NFRC
Scroll to Top